SECTION 000020 – LEGAL NOTICE

 

Morton Grove Park District

6834 Dempster Street

Morton Grove, IL 60053

 

 

PIONEER PARK

 

The Morton Grove Park District does hereby invite sealed bids for Pioneer Park.  Work will include site clearing, earthwork operations, concrete curbs and walks, site furnishings, playfield equipment, planting and seeding.

 

Project manuals, including bid form and specifications, and construction documents are available after 10:00 am on January 18, 2018, from Accurate Reprographics, 2368 Corporate Lane, Suite 100, Naperville, IL 60565, 630.428.4433, www.hitchcockplanroom.com. Bidding documents are available at the non-refundable cost of reproduction.

 

Bids will be accepted at the Morton Grove Park District, 6834 Dempster Street, Morton Grove, IL 60053, during regular office hours.  All bids must be submitted in a sealed envelope marked with the Contractor’s name and address, and “Bid for Pioneer Park,” on the face of the envelope.  Bids must be received no later than 10:00 AM on January 30, 2018. Bids will be opened at 10:00 AM on January 30, 2018, at the Morton Grove Park District, 6834 Dempster Street, Morton Grove, IL 60053. All bidders will be required to submit Bid Security in the form of a Bid Bond, Certified Check, Cashier’s Check in the amount of 10% of the Base Bid, payable to the Morton Grove Park District.

 

The successful bidder, as determined by the Morton Grove Park District, shall be required to pay, and to agree to pay no less than the Prevailing Rate of Wages, pursuant to the Illinois Prevailing Wage Act (820 ILCS 130) for the locality of the Morton Grove Park District (Cook County), to each laborer worker, or mechanic needed or used to complete the work as detailed in the contract to be let.  The successful contractor, and all subcontractors shall be required to submit, to the Morton Grove Park District, certified payrolls no later than the tenth day of each calendar month for the immediately preceding month.

 

The Morton Grove Park District reserves the right to reject any and all proposals, parts of any and all proposals, or to waive technical errors or omissions in submitted proposals.  No submitted bid may be withdrawn until a period of sixty (60) days after the bid opening date, without the written consent of the Morton Grove Park District.  The Morton Grove Park District encourages minority business firms to submit bids on this project and the successful contract bidder to utilize minority businesses as sub-contractors for supplies, equipment, services, and construction. Questions should be directed to Joseph Brusseau or Doug Fair, Hitchcock Design Group at 630.961.1787 jbrusseau@hitchcockdesigngroup.com or dfair@hitchcockdesigngroup.com.

 

END OF SECTION 000020